The specialists of JasylMeken LLP have developed the Environmental Protection section as part of the project documentation for Baltest LLP. The work was carried out in accordance with the requirements of the Environmental Code of the Republic of Kazakhstan, Order No. 280 dated 07/30/2021 “On Approval of instructions for the organization and conduct of environmental […]
The company “Zhasyl Meken” has developed an environmental impact assessment (EIA) project for JSC “Koktas”. This project was aimed at a comprehensive assessment of the environmental consequences of the planned activities of the enterprise and the development of measures to reduce possible negative impacts. As part of the work, calculations of air emissions, analysis of […]
The company “Zhasyl Meken” performed work on screening the impacts of the planned activities for “GerAymak” LLP. This stage is a preliminary assessment of the environmental consequences of the implementation of the project for the reclamation of disturbed lands in areas provided for the extraction of common minerals in groundwater reserves. The screening allowed us […]
The section was developed within the framework of the project «Construction of a processing plant with a capacity of 4 million tons per year at the Shalkiya deposit» in accordance with Appendix 3 to the Instructions for organizing and conducting an environmental assessment (order №280 dated July 30, 2021); Methodology for determining emission standards into […]
PROJECT ADJUSTMENT. Standards for permissible emissions (NPE) of pollutants into the environment for AKMEZ LLP for 2024–2033. In order to ensure environmental safety and compliance with environmental legislation, an adjustment was made to the draft standards for permissible emissions (NPE) of pollutants into the atmosphere for AKMEZ LLP for the period 2024–2033. The NPE draft […]
Development of a draft of standards for permissible emissions (MPE) for KazGPZ LLP for 2025–2026. As part of ensuring environmental responsibility and compliance with the environmental legislation of the Republic of Kazakhstan, a draft of standards for permissible emissions (MPE) of pollutants into the atmosphere was developed for KazGPZ LLP. KazGPZ LLP receives, processes and […]
Draft standards of permissible discharges (VAT) for the State Enterprise “Alga-Zhylu” in the settlement of Bestamak, for 2025-2034. Within the framework of this project, the permissible discharge of pollutants entering the filtration fields from the activities of the State Enterprise “Alga-Zhylu” (settlement of Bestamak, Alginsky district, Aktobe region) is calculated. The project was developed in […]
Draft standards of permissible discharges (VAT) in mine and domestic wastewater of the Shalkiya deposit of JSC “Shalkiya Zinc LTD” for 2025-2032. The draft standards of permissible discharges of pollutants in wastewater (discharges No. 1 and No. 2) was developed to ensure environmental safety at the Shalkiya deposit for the period 2025-2032. In order to […]
Draft standards for maximum permissible emissions (MPE) for «Nova Zinc» LLP. Air protection is a priority in ensuring the environmental safety of industrial production. One of the key tools in this area is the development of standards for maximum permissible emissions (MPE) — a document establishing permissible volumes of pollutant emissions into the air, based […]